External Data Sources Procedures
Use these procedures when working with external data sources.
Related topics:
- Oracle Primavera Procedures
Use these procedures when working with Oracle Primavera. - Set the Microsoft Project Platform Options
You can specify the field that Acumen Forensics should use to uniquely identify an activity, specify that Acumen should import the MPP files directly if you don't have Microsoft Project installed, and modify the default mapping when Acumen imports a project from Microsoft Project. - Import Project Data From Microsoft Project Server
Use these steps to link to and import data from a Project Web App (PWA) site into Acumen. - Set the Open Plan Platform Options
Enter your username and password so that you don't have to enter them every time that you import an Open Plan project and specify whether you want to identify imported Open Plan code fields using their description, name, ID, or a prompt. - Merge Multiple Data Sources into a Single Dataset
Merging is not limited to cost/schedule. Any dataset that has an ID structure that corresponds with the activity IDs in the main dataset can be merged. - Allow For Float-Based Analysis (Asta PowerProject)
Asta PowerProject files do not contain float values for activities, therefore if float-based analysis is required for an Asta PowerProject in Acumen, you must allow for it before importing the .mdb file.