S4 // Acceleration Tab (Acumen 360)
Acumen 360 is a schedule remediation and acceleration product. You use it to accelerate or compress project schedules to meet faster completion deadlines or to get a delayed project back on track.
In addition, 360 can be used to hypothesize acceleration options or model potential delays.
Acumen 360 runs a CPM simulation running hundreds of iterations, progressively accelerating the project towards a defined goal using sets of user-definable criteria.
There are three acceleration options:
The S4 // Acceleration tab includes a script library/editor and a step library/editor.