Use this screen to set up a shop calendar for a specified range of calendar days. If you selected the Shop Days option on the Configure Production Control Settings screen, the system will use the shop calendar for material lead time and capacity planning
Use this screen to set up the shop floor calendar and to make modifications as required. Do not use this screen if you did not select the Shop Days option on the Configure Production Control Settings screen.
Enter the starting date of the period for which you would like to generate shop days. The start date must be no more than one day later than the current last shop calendar date.
Enter the ending date of the period for which you would like to generate shop days. The end date must be no less than one day earlier than the current first shop calendar date.
Enter the shifts required for each day of the week. A zero will cause that day to be considered inactive for lead-time and capacity calculations.
Click this button to automatically load new shop days. The table window will be populated with information concerning each new shop day.
This field displays the calendar date.
This field displays the date's day of the week.
This field displays the default number of shifts for the day.
This field displays the number of days the shop has been open for the year. A day is considered a shop day when there is at least one shift.