Use this subtask to view or modify labor/subcontract routings for this MO. Enter routings information in the Manage Routings and Release Routings screens in Costpoint Routings. This subtask is disabled if you do not have access to Costpoint Routings.
This field displays the manufacturing order ID of the line selected on the main screen.
This field displays the MO Status as Planned, Firm Planned, Released, In-Shop, Completed, or Closed.
This field displays the ID of the part that is built in the MO selected on the main screen.
This field displays the revision ID for the build part.
This field displays the total quantity of the part being built with this MO.
This field displays the routing number of the part to be built. To modify this field, enter the routing number or use to select one. The routing description displays in the adjacent field.
This field displays routing header notes associated with the selected MO build part's routing.
Select this check box to have the system hide alternate operations on the selected routing.
Select this check box to have the system hide all completed operations on the selected MO.
Select this check box to have the system overwrite existing routing line rows when the Autoload action is executed.
Click this button to automatically load routings. The build part/revision and routing number in the header of this screen will determine what routing lines are loaded. Only routings of the build part will be pulled in. Subassembly routings are not included, no matter how many levels of explosion are requested. You cannot autoload routings after timesheets have been entered against the MO or if the MO is completed or closed.
The Autoload function will include routing lines with a starting effective date of earlier than, or the same as, the as of date (for the MO build part) and an ending effective date (if not blank) later than the as of date.
If you select the Hide Alternate Operations check box, the Autoload function will load alternate routing lines (resulting in duplicate operation and step numbers). If you enter an active routing number for the build part and select the Autoload button (even if the routing table window is populated), the system displays the following warning: "Routing rows already exist for this MO. Auto-loading routings will overwrite existing routing rows". If you select Yes, the table window will populate with the routing information specified in the Routing No field. If you select No, you will return to the subtask as it currently displays.
If you selected the Allow Full Changes on MO Routing Lines check box on the Configure Production Control Settings screen, you can select and load alternate work centers. You can delete routing lines only if alternates exist. You cannot add new lines.
This table window displays labor and/or subcontract routings for this MO. If a line's Lab/Subcon value is L (Labor), the operation information populates this field from the Manage Labor Operations screen in Costpoint Routings. Similarly, if a line's Labor/Subcontract value is S (Subcontract), the operation information populates this field from the Manage Subcontract Operations screen. If you did not select the Load Capacity Planning Routing Lines to MO check box on the Configure Production Control Settings screen, capacity planning-only routing lines (where the Step Type is P for the routing line on the Manage Routings and/or Release Routings screens in Costpoint Routings) are excluded when you click the Autoload button.
This field displays the operation sequence number of the routing step. This field is modifiable if you select the Allow Full Changes on MO Routing Lines check box on the Configure Production Control Settings screen. Enter, or use to select, the operation sequence. This number's length is limited to four digits. It is populated from the routing if you use the Autoload function.
If the Hide Alternate Operations check box is cleared, this field displays an alternate operation sequence. The default is 0 for the main operation or new line. This number is greater than zero for an alternate operation. This field is populated from the routing if you use the Autoload function.
This field displays the step number of the routing operation. Only routing lines with a step type of S (Standard) are loaded. Routing lines with a step type of C (Cost Only) or P (Capacity Planning Only) are not loaded when you click the Autoload button. To modify this field, enter a step number or use to select one.
This field displays the labor or subcontract operation code of the operation being performed in this routing step. To modify this field, enter an operation or use to select one. This value is populated from the routing if you use the Autoload feature.
This field displays the description of the operation. This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from the Operations menu screens in Costpoint Routings.
This field displays the code type L (Labor) or S (Subcontract). This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from Operations menu screens in Costpoint Routings.
This field displays the work center at which the labor operation is being performed. This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from the Operations menu screens in Costpoint Routings. To modify this field, enter a work center or use to select one.
This field displays the description of selected the work center.
To specify the run type, enter V if run hours are calculated on a per unit basis, and F if it is not based on order size. This value is populated from the routing if you use the Autoload feature.
This modifiable field displays the number of operation hours it takes to complete one unit, if the Run Type field is V or the number of operation hours for the MO, if the Run Type field is F in this routing step. This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from the Operations menu screens in Costpoint Routings.
This field displays the total run hours required to complete all units in this routing step. If the Run Type field is V, this will be equal to Total MO Build Qty * Unit Run Hours.
This field displays the operation type of the selected operation. This value is populated from the routing if you use the Autoload feature.
This field displays the setup time in hours required for this routing step. This defaults in from the routing if Auto-Load is used. If the line is new, this field displays the setup hours from the Work Center Detail subtask of the Manage Work Centers screen in Costpoint Routings. You can modify this field.
This field displays the type of overlap for starting this operation before the previous operation finishes: H (Hours), N (None), S (Setup), and U (Units). If you use the Autoload button, this field displays the overlap type from Costpoint Routings. If you manually add a new line, this field will default as N. To modify this field, place your cursor in the field and use the drop-down list to select the overlap type.
This field displays the amount in hours or units by which the start of this operation can overlap the previous one. This defaults in from the routing if Autoload is used. You can modify this field.
This field displays the process type code for this routing. If the line is new, this will default in from the work center or the Operations menu in Costpoint Routings, depending upon your selection in the Routing Primary Default Source group box on the Configure Routing Settings screen.
Select this check box if this operation requires users to record completion in SFC. This defaults in from the routing if Autoload is used. If the line is new, this will default in from the Operations menu in Costpoint Routings.
Select this check box if this is a QC operation that will require QC approval in Shop Floor Control (SFC). This defaults in from the routing if Autoload is used. If the line is new, this will default in from the Operations menu in Costpoint Routings.
This field displays the date this routing step should be started. This will default in the planned in-shop date (for the first line) if Autoload is used. This field can be modified.
This field displays the date this routing was started. This will default in the actual in-shop date (for the first line) if Autoload is used. This field can be modified.
This field displays the date this routing step needs to be completed. This field can be modified.
This field displays the date this routing step is to be completed. This will default to the actual need date if Autoload is used. This field can be modified.
This field displays the completion date of this routing step. You can modify this field.
This field displays free-form text notes relating to this routing step. These notes can be modified.
This field displays the current completed quantity in this operation.
This field displays the quantity accepted for the operation line in the MO.
This field displays the quantity rejected for the operation line in the MO.
This field displays the quantities placed in MRB for this operation.
This is a user-defined field label set up on the Configure Routings Settings screen. This will default in from the routing if Auto-Load is used.
This is a user-defined field label set up on the Configure Routings Settings screen. This will default in from the routing if Auto-Load is used.
This is a user-defined field label set up on the Configure Routings Settings screen. This will default in from the Routing if Auto-Load is used.
Subtask |
Description |
Alternate Work Center |
Click this link to view work centers that can be used in place of the designated work center. Data can be used only as a reference and cannot be saved. |