MANAGE CONFIGURATION IDENTIFIERS

Use this screen to enter Bills of Material (BOM) Configuration IDs and their descriptions. You can use these IDs in the Manage Manufacturing Bills of Material screen to record different BOM configurations for the same assembly part/revision combinations. You can generate configurations on the screens in the Manufacturing Bills of Material menu, and you can use this screen to preset, modify, or review these configurations.

You can also use this screen to view existing configurations and their descriptions. You can modify or delete existing lines or click on the toolbar to add more configurations. You can also use to restrict the number of configurations displayed.

Set up this screen after establishing the controls and defaults in the Configure Bills of Material Settings screen and before you create BOMs; you can use to import established configurations. You can add, delete, or modify configuration identifiers from this screen whenever necessary.

Location

Table Window

This table window lists all available configuration IDs. Click to add new configuration IDs to the list.

Configuration ID

Use this field to enter an identification code for this BOM configuration.

Description

Use this field to enter a description for this BOM configuration.

Link Projects Table Window

Use this table window to link projects to the selected configuration ID in the above table window.

Project

Use this field to enter, or use to select, the project ID you want to link to this configuration. This field is populated automatically if you enter data in the Proj Abbrev field.

Project Abbrev

Use this field to enter, or click to select, a valid abbreviation of the project to link to this configuration. This field is populated automatically if you enter data in the Project field.

Project Name

This field displays the description of this project.

Active

This field displays Y (Yes) if the project is active (and is therefore chargeable). Otherwise, this field displays N (No).

Starting Date

This field displays the period of performance starting date of the project.

Ending Date

This field displays the period of performance ending date of the project.